Zhanru Film Equipment Rental logoZhanru Film Equipment
Project FAQChangchun·Event production

影宝航空文化展示中心王者荣耀全国大赛tvc | Project FAQ in Changchun

影宝航空文化展示中心王者荣耀全国大赛tvc was completed in Changchun on 2026-07-04 as a event production project. This project faq covers 30 project Q&As, 43 equipment lines.

Project overview

影宝航空文化展示中心王者荣耀全国大赛tvc was completed in Changchun on 2026-07-04 as a event production project. This project faq covers 30 project Q&As, 43 equipment lines.

Use the project facts, field images and equipment record below to create a starting checklist for a similar production.

Prepared/reviewed by: Zhanru Camera Team·Published online

This project faq documents one authorised event production source from Changchun: 30 reviewed Q&A records, 43 equipment lines and 0 linked field images. It is a single-project evidence record, not a universal prescription or current inventory statement.

Project date
2026-07-04
Project city
Changchun
Business type
Event production

Planning checklist

Preparation priorities

  • 1Resolve uncertainties before the shoot day
  • 2Check quantities and accessories by scene
  • 3Prepare an alternative for each critical recording path

Equipment used

Equipment used for this project

Use this as a starting checklist. Matched models link directly to detailed equipment and selection resources.

  • 索尼FX3机身Sony FX3
  • 电池 × 4
  • 电充
  • CFA80卡 × 2
  • CFA读卡器
  • 三脚架
  • 索尼35MM定焦镜头Sony 35mm F1.4
  • 索尼50MM定焦镜头Sony 50mm F1.4
  • 索尼16-35G一代
  • 索尼24-70G一代
  • 索尼70-200G一代
  • 威固A5小监
  • 970电池 × 3
  • 970双充
  • HDMI短线 × 2
  • 怪手 × 2
  • 威固A5小监备用套装 x1(推测)
  • 大疆RS5稳定器DJI RS 5
  • 大疆RS5稳定器提壶DJI RS 5
  • 爱图仕600D × 2Aputure 600D
  • 04腿 × 4
  • 伞罩 × 3
  • 插排线 × 3
  • 爱图仕300D
  • 南光30C四尺棒灯 × 2
  • 南光30C四尺棒灯充电器 × 2
  • 1度电移动电源 × 2
  • 1度电移动电源充电器 × 2
  • 1100W电小二
  • 爱图仕22X布灯
  • 魔术腿 × 10
  • 鱼竿
  • 米菠萝带鱼叉
  • 色纸 一些
  • 大黑棋 × 4
  • 小黑棋 × 2
  • 沙袋 × 6
  • 苹果箱 × 4
  • 板车 × 2
  • 灯光大助
  • 灯光小助 × 2
  • 化妆师
  • 其他

Project FAQ

Preparation FAQs for a similar project

What source supports this project faq?

One authorised project record from Changchun, dated 2026-07-04, with 30 reviewed Q&A records and 43 equipment lines.

Does the equipment list represent current inventory?

No. It records equipment associated with this historical project and does not promise current stock, rentable quantity or city availability.

Can this single project be generalised to every production?

No. It is a bounded first-party record. Venue, date, crew, deliverables and current equipment conditions must be confirmed for each project.