b站和海洋车主共创活动拍摄 | Illustrated field record in Shanghai
b站和海洋车主共创活动拍摄 was completed in Shanghai on 2026-07-10 as a event production project. This illustrated field record covers 34 project Q&As, 29 equipment lines and 4 field images.
Project overview
b站和海洋车主共创活动拍摄 was completed in Shanghai on 2026-07-10 as a event production project. This illustrated field record covers 34 project Q&As, 29 equipment lines and 4 field images.
Use the project facts, field images and equipment record below to create a starting checklist for a similar production.
This illustrated field record documents one authorised event production source from Shanghai: 34 reviewed Q&A records, 29 equipment lines and 4 linked field images. It is a single-project evidence record, not a universal prescription or current inventory statement.
- Project date
- 2026-07-10
- Project city
- Shanghai
- Business type
- Event production
Project field notes
Project field record
Field images help explain the working environment and equipment placement.




Planning checklist
Preparation priorities
- 1Use the field layout to plan equipment positions
- 2Leave room for cables, power and crew access
- 3Plan media and backup around final deliverables
Equipment used
Equipment used for this project
Use this as a starting checklist. Matched models link directly to detailed equipment and selection resources.
- 宝锋对讲机 × 20
- 对讲机充电器 × 20
- 对讲机耳机 × 20
- Godox 2400bi × 2
- Godox 1200r × 3
- 阿莱s60 × 4
- 布灯 × 2
- 爱图仕600c二代 × 2
- 爱图仕80c × 4
- 泰胆4尺RGB × 8
- 钢腿 × 6
- 04腿 × 4
- 32A电源线 × 10
- 16A电源线 × 15
- 四分盒 × 4
- 魔术腿 × 10
- 4尺柔光片 × 8
- 墙插线板 × 8
- 20蝴蝶布
- 12蝴蝶布 × 2
- 387
- 钓鱼竿
- 鹰抓 × 4
- 大力夹 × 4
- 鱼叉 × 4
- 米菠萝 × 4
- 描图纸
- 大力胶
- 黑卡纸 × 10
Project FAQ
Preparation FAQs for a similar project
What source supports this illustrated field record?
One authorised project record from Shanghai, dated 2026-07-10, with 34 reviewed Q&A records and 29 equipment lines.
Does the equipment list represent current inventory?
No. It records equipment associated with this historical project and does not promise current stock, rentable quantity or city availability.
Can this single project be generalised to every production?
No. It is a bounded first-party record. Venue, date, crew, deliverables and current equipment conditions must be confirmed for each project.
RELATED PRODUCTION GUIDES
